WEB ANNOUNCE::
Position:home>Travel News>

Mayor Xu Tang Xian: ? Does honest censure Gan of ǔ showing disrespect or conte

From;    Author:Stand originally


Another fill the sea to build insular project to be project of big talk opern. This project is located in area of seaside of big talk core to fill sea isle, on the west look into the distance from a high place on the west the coast is banding park, adjacent century big bridge is mixed east century park, north lies between Hai Dianxi and photograph of sea pasture island to look. This project communicates culture of high administrative levels of construction big talk the place, become the platform that Hainan world culture communicates, the hall that citizen and art communicate. The plan fills the sea to form prep above highest tide the artificial island of sea level, opern ground floor accumulates 6.67 hectare, construction fills road of island of sea area annulus and embankment to defend wait for municipal facilities; Blowing fill opern of big talk of the construction on the isle, include the operatic office of seat of a 1200——1500 among them, of a 500 seats muti_function hall, a 800——1000 the odeum of the seat, exhibition of post of painting and calligraphy, photography, outfit, sculpture, contented art. Total floor area makes an appointment with 25 thousand square metre, total investment makes an appointment with 450 million yuan.

Development means is passed with the enterprise action, pat, hang means to gain land access lawfully, undertake developing construction and management, the government expends collection respect to offer privilege in gold of land sell one's own things, duty. It is reported, at present this project already finished plan to design, developing initial design; Already reported maritime space to use apply for beforehand, weaving maritime space is used reach annulus to criticize a report. (Author: Poplar Chun Hong)



Previous 1 2Next

About us | Legal Notices | Sitemap | Links | Partner